ITAC Assessment: OK0135
ITAC logo
ITAC Assessment: OK0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PRINTED CIRCUIT BOARDS
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area
n/a
Annual Production 50,000
pieces
Production Hrs. Annual 3,175
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,861 825,909
kWh
Natural Gas $3,017 663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,133 $856 $1,133
24,326
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $190 $226 $190
4,103
kWh
- -
03 2.2437: Recover waste heat from equipment $207 $198 - $207
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $338 $596 $219
5,862
kWh
- $119
05 2.7447: Install vinyl strip / high speed / air curtain doors $505 $344 - $505
-
MMBtu
-
06 2.7226: Use computer programs to optimize hvac performance $588 $1,228 $588
19,930
kWh
- -
07 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $40 $50 $40
1,465
kWh
- -
08 2.7229: Air condition only space necessary $191 $440 - $191
-
MMBtu
-
TOTAL RECOMMENDED $3,192 $3,938 $2,170
55,686
kWh
$903
-
MMBtu
$119
TOTAL IMPLEMENTED $1,909 $2,140 $1,392
31,653
kWh
$398
-
MMBtu
$119
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs