ITAC Assessment: OK0134
ITAC logo
ITAC Assessment: OK0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product METAL FABRICATION
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 300,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,329 97,890
kWh
Natural Gas $3,352 795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $948

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $236 - $213
4,103
kWh
- $23
02 2.7142: Utilize higher efficiency lamps and/or ballasts $68 $118 $68
1,172
kWh
- -
03 2.2532: Use only amount of air necessary to prevent explosion hazard $84 $240 $55
1,172
kWh
$29
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42 $35 $42
879
kWh
- -
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $21 $60 $21
293
kWh
- -
06 2.7261: Install timers and/or thermostats $497 $550 - $497
-
MMBtu
-
TOTAL RECOMMENDED $948 $1,003 $399
7,619
kWh
$526
-
MMBtu
$23
TOTAL IMPLEMENTED $948 $1,003 $399
7,619
kWh
$526
-
MMBtu
$23
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs