ITAC Assessment: OK0133
ITAC logo
ITAC Assessment: OK0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ASPHALT PAVING MATERIAL
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area
n/a
Annual Production 200,000
ton
Production Hrs. Annual 2,860
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,471 1,082,063
kWh
Natural Gas $254,805 73,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,321

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $86,486 $28,000 - $86,486
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,495 $450 - $1,615
-
MMBtu
$(-120.0)
03 2.6218: Turn off equipment when not in use $11,684 $816 - $11,684
-
MMBtu
-
04 2.2511: Insulate bare equipment $4,213 $5,058 - $4,213
-
MMBtu
-
05 2.2511: Insulate bare equipment $15 $33 - $15
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $181 - $181
3,224
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $38 $25 $38
586
kWh
- -
08 2.2414: Use waste heat from hot flue gases to preheat $56,217 $125,000 - $56,217
-
MMBtu
-
09 2.7261: Install timers and/or thermostats $98 $500 - $98
-
MMBtu
-
TOTAL RECOMMENDED $160,427 $159,882 $219
3,810
kWh
$160,328
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $98,321 $29,374 $38
586
kWh
$98,283
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs