Assessment Year | 1984 |
---|---|
Principal Product | ASPHALT PAVING MATERIAL |
NAICS |
n/a
|
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $1 M to 5M |
# of Employees | 5 |
Plant Area |
n/a
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,471 | 1,082,063 |
kWh
|
$0.061 |
Natural Gas | $254,805 | 73,926 |
MMBtu
|
$3.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $160,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $98,321 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $86,486 | $28,000 | - |
$86,486
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,495 | $450 | - |
$1,615
-
MMBtu
|
$(-120.0) | |
03 | 2.6218: Turn off equipment when not in use | $11,684 | $816 | - |
$11,684
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $4,213 | $5,058 | - |
$4,213
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $15 | $33 | - |
$15
-
MMBtu
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $181 | - |
$181
3,224
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38 | $25 |
$38
586
kWh
|
- | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $56,217 | $125,000 | - |
$56,217
-
MMBtu
|
- | |
09 | 2.7261: Install timers and/or thermostats | $98 | $500 | - |
$98
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $160,427 | $159,882 |
$219
3,810
kWh
|
$160,328
-
MMBtu
|
$(-120.0) | ||
TOTAL IMPLEMENTED | $98,321 | $29,374 |
$38
586
kWh
|
$98,283
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs