ITAC Assessment: OK0124
ITAC logo
ITAC Assessment: OK0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area
n/a
Annual Production 600
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,256 701,641
kWh
Natural Gas $16,329 4,314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $5,465 $650 - $5,465
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $130 $30 $130
2,052
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,730 $256 $1,730
28,722
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $56 - $56
879
kWh
-
05 2.2437: Recover waste heat from equipment $218 $516 - $218
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $64 $485 $64
1,172
kWh
-
TOTAL RECOMMENDED $7,663 $1,937 $1,980
32,825
kWh
$5,683
-
MMBtu
TOTAL IMPLEMENTED $7,663 $1,937 $1,980
32,825
kWh
$5,683
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs