Assessment Year | 1984 |
---|---|
Principal Product | HEAT EXCHANGERS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
n/a
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $40,256 | 701,641 |
kWh
|
$0.057 |
Natural Gas | $16,329 | 4,314 |
MMBtu
|
$3.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,663 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $5,465 | $650 | - |
$5,465
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $130 | $30 |
$130
2,052
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,730 | $256 |
$1,730
28,722
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $56 | - |
$56
879
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $218 | $516 | - |
$218
-
MMBtu
|
|
06 | 2.4322: Use or replace with energy efficient substitutes | $64 | $485 |
$64
1,172
kWh
|
- | |
TOTAL RECOMMENDED | $7,663 | $1,937 |
$1,980
32,825
kWh
|
$5,683
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,663 | $1,937 |
$1,980
32,825
kWh
|
$5,683
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs