ITAC Assessment: OK0121
ITAC logo
ITAC Assessment: OK0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product REBAR, FENCE POSTS
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 200,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,448,100 140,364,891
kWh
Natural Gas $2,154,200 637,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $389,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,384 $2,880 $1,384
41,032
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,065 - $2,065
52,169
kWh
- -
03 2.7261: Install timers and/or thermostats $557 $650 - $557
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $58,510 $174,400 $62,460
1,580,891
kWh
- $(-3,950.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,956 $928 $2,956
76,202
kWh
- -
06 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $323,750 $847,440 $513,750
12,168,816
kWh
- $(-190,000.0)
TOTAL RECOMMENDED $389,222 $1,026,298 $582,615
13,919,110
kWh
$557
-
MMBtu
$(-193,950.0)
TOTAL IMPLEMENTED $62,850 $178,208 $66,800
1,698,125
kWh
- $(-3,950.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs