ITAC Assessment: OK0109
ITAC logo
ITAC Assessment: OK0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SCRAP METAL
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,742 1,167,937
kWh
Natural Gas $130,617 37,826
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $661 $411 $661
14,068
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,453 $10,800 $2,453
56,272
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $205 $340 $205
4,396
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $83 - $83
3,224
kWh
-
05 2.4133: Use most efficient type of electric motors $450 $1,339 $450
7,034
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $62,013 $800 - $62,013
-
MMBtu
07 2.7261: Install timers and/or thermostats $341 $500 - $341
-
MMBtu
TOTAL RECOMMENDED $66,206 $14,190 $3,852
84,994
kWh
$62,354
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs