| Assessment Year | 1983 |
|---|---|
| Principal Product | BRICKS |
| NAICS |
n/a
|
| SIC | 3255: Clay Refractories |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 44,000,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $138,485 | 3,449,883 |
kWh
|
$0.040 |
| Natural Gas | $313,452 | 91,468 |
MMBtu
|
$3.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,922 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $76,823 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $35,511 | $1,133 | - |
$35,511
-
MMBtu
|
|
| 02 | 2.4221: Install compressor air intakes in coolest locations | $99 | $148 |
$99
2,638
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $109 | $73 |
$109
2,345
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $3,552 | $3,810 |
$3,552
109,613
kWh
|
- | |
| 09 | 2.4133: Use most efficient type of electric motors | $2,084 | $2,528 |
$2,084
58,617
kWh
|
- | |
| 10 | 2.8122: Use utility controlled power management | $6,953 | - |
$6,953
39,859
kWh
|
- | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $68 | - |
$68
2,638
kWh
|
- | |
| 12 | 2.2515: Use optimum thickness insulation | $28,546 | $6,480 | - |
$28,546
-
MMBtu
|
|
| TOTAL RECOMMENDED | $76,922 | $14,172 |
$12,865
215,710
kWh
|
$64,057
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $76,823 | $14,024 |
$12,766
213,072
kWh
|
$64,057
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs