ITAC Assessment: OK0106
ITAC logo
ITAC Assessment: OK0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product BRICKS
NAICS
n/a
SIC 3255: Clay Refractories
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 44,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,485 3,449,883
kWh
Natural Gas $313,452 91,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $35,511 $1,133 - $35,511
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $99 $148 $99
2,638
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $109 $73 $109
2,345
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $3,552 $3,810 $3,552
109,613
kWh
-
09 2.4133: Use most efficient type of electric motors $2,084 $2,528 $2,084
58,617
kWh
-
10 2.8122: Use utility controlled power management $6,953 - $6,953
39,859
kWh
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $68 - $68
2,638
kWh
-
12 2.2515: Use optimum thickness insulation $28,546 $6,480 - $28,546
-
MMBtu
TOTAL RECOMMENDED $76,922 $14,172 $12,865
215,710
kWh
$64,057
-
MMBtu
TOTAL IMPLEMENTED $76,823 $14,024 $12,766
213,072
kWh
$64,057
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs