ITAC Assessment: OK0101
ITAC logo
ITAC Assessment: OK0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SYNTHETIC CARPET YARNS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 196
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,635 14,754,103
kWh
Natural Gas $209,669 63,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $3,717 $160 - $3,717
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $12,759 $1,000 - $12,759
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $57,000 $9,140 $57,000
1,900,938
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,085 $3,197 $6,085
155,627
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $117 $406 $117
3,810
kWh
-
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $241 $70 - $241
-
MMBtu
TOTAL RECOMMENDED $79,919 $13,973 $63,202
2,060,375
kWh
$16,717
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs