ITAC Assessment: IA0229
ITAC logo
ITAC Assessment: IA0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aerial Boom Lifts
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 221,000
ft2
Annual Production 960
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,278 3,387,456
kWh
Electricity Demand $27,130 9,036
kW-mo/yr
Natural Gas $78,154 16,404
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $569,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,046

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,090 $294 $877
34,877
kWh
$213
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $360 $30 $299
11,723
kWh
$61
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,122 - $5,079
201,641
kWh
$1,043
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $399 $1,324 $331
13,189
kWh
$68
-
kW-mo/yr
- - - -
05 4.111: Add equipment/ operators to reduce production bottleneck $540,000 $1,501,800 - - - - - $540,000
06 3.3113: Use other methods for neutralization $12,382 $7,990 $(-56.0)
(-2,345)
kWh
$(-161.0)
-
kW-mo/yr
$12,599
-
gal
- - -
07 3.3128: Utilize other methods to remove contaminants $4,907 $200 - - - $4,907
-
lb
- -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $3,144 $7,480 - - - $3,144
-
lb
- -
09 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $956 $143 - - - - $956
-
lb
-
TOTAL RECOMMENDED $569,360 $1,519,261 $6,530
259,085
kWh
$1,224
-
kW-mo/yr
$12,599
-
gal
$8,051
-
lb
$956
-
lb
$540,000
TOTAL IMPLEMENTED $2,046 $437 $877
34,877
kWh
$213
-
kW-mo/yr
- - $956
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs