Assessment Year | 2018 |
---|---|
Principal Product | Terpene Resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 18 |
Plant Area |
150,000
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $148,561 | 2,537,613 |
kWh
|
$0.059 | |
Electricity Demand | $78,434 | 5,148 |
kW-mo/yr
|
$15.24 | |
Electricity Fees | $36,846 | - |
|
- | |
Natural Gas | $77,533 | 13,923 |
MMBtu
|
$5.57 | |
Other Energy | $212,806 | 23,422 |
MMBtu
|
$9.09 | |
Waste Disposal Costs | |||||
Water Usage | $75,538 | 18,744 |
Tgal
|
$4.03 | |
TOTAL YEARLY COSTS | $629,718 | ||||
RECOMMENDED SAVINGS* | $307,535 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $82,624 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $219,545 | $970,000 |
$152,100
2,600,000
kWh
|
$73,133
-
kW-mo/yr
|
$(-119,912.0)
-
MMBtu
|
$114,224
-
MMBtu
|
- | - | |
02 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $4,699 | $15,000 | - | - |
$4,699
-
MMBtu
|
- | - | - | |
03 | 2.2522: Isolate hot or cold equipment | $5,366 | $5,125 |
$5,366
91,728
kWh
|
- | - | - | - | - | |
04 | 2.3212: Optimize plant power factor | $1,303 | $2,207 | - | - | - | - | $1,303 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,084 | $1,020 |
$722
12,355
kWh
|
$362
-
kW-mo/yr
|
- | - | - | - | |
06 | 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste | $75,538 | $33,400 | - | - | - | - | - | $75,538 | |
TOTAL RECOMMENDED | $307,535 | $1,026,752 |
$158,188
2,704,083
kWh
|
$73,495
-
kW-mo/yr
|
$(-115,213.0)
-
MMBtu
|
$114,224
-
MMBtu
|
$1,303 | $75,538 | ||
TOTAL IMPLEMENTED | $82,624 | $51,627 |
$722
12,355
kWh
|
$362
-
kW-mo/yr
|
$4,699
-
MMBtu
|
- | $1,303 | $75,538 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs