ITAC Assessment: OK0098
ITAC logo
ITAC Assessment: OK0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product CALCIUM CARBIDE
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 36,000
ton
Production Hrs. Annual 8,344
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,199,248 121,657,094
kWh
Natural Gas $84,206 28,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $318,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,570

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $985 $100 $985
47,773
kWh
- -
02 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $296,722 $802,436 $518,182
17,584,994
kWh
- $(-221,460.0)
03 2.4133: Use most efficient type of electric motors $5,585 $35,277 $5,585
184,349
kWh
- -
04 2.2422: Use waste heat from hot flue gases to generate steam $15,699 $34,357 - $15,699
-
MMBtu
-
TOTAL RECOMMENDED $318,991 $872,170 $524,752
17,817,116
kWh
$15,699
-
MMBtu
$(-221,460.0)
TOTAL IMPLEMENTED $6,570 $35,377 $6,570
232,122
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs