Assessment Year | 1983 |
---|---|
Principal Product | MEAT,HOT LINKS,SAUSAGE |
NAICS |
n/a
|
SIC | 2011: Meat Packing Plants |
Sales Range | $1 M to 5M |
# of Employees | 56 |
Plant Area |
n/a
|
Annual Production | 8,750,000
lb
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $61,407 | 1,395,076 |
kWh
|
$0.044 |
Natural Gas | $41,888 | 13,230 |
MMBtu
|
$3.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,509 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,246 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $297 | $318 |
$297
5,275
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $865 | - |
$865
15,533
kWh
|
- | |
03 | 2.7261: Install timers and/or thermostats | $2,949 | $725 | - |
$2,949
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,615 | $600 | - |
$4,615
-
MMBtu
|
|
05 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $184 | $785 | - |
$184
-
MMBtu
|
|
06 | 2.3212: Optimize plant power factor | $359 | $1,700 |
$359
11,723
kWh
|
- | |
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $240 | $97 | - |
$240
-
MMBtu
|
|
TOTAL RECOMMENDED | $9,509 | $4,225 |
$1,521
32,531
kWh
|
$7,988
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,246 | $1,043 |
$297
5,275
kWh
|
$2,949
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs