ITAC Assessment: OK0091
ITAC logo
ITAC Assessment: OK0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product OIL WELL PARTS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,164 783,998
kWh
Natural Gas $21,485 6,797
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $4,250 $420 - $4,250
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $895 $4 $11
293
kWh
$884
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $962 $165 $962
17,585
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $334 $400 $334
5,862
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $217 $102 $217
7,327
kWh
-
06 2.2437: Recover waste heat from equipment $63 $135 $63
586
kWh
-
07 2.1213: Direct warmest air to combustion intake $1,100 $315 - $1,100
-
MMBtu
TOTAL RECOMMENDED $7,821 $1,541 $1,587
31,653
kWh
$6,234
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs