ITAC Assessment: OK0089
ITAC logo
ITAC Assessment: OK0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product FLOUR, FEED, CORNMEAL
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $1
M
to 5
M
# of Employees 175
Plant Area
n/a
Annual Production 80,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,770 11,424,092
kWh
Natural Gas $81,440 25,094
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $410 $50 $410
6,741
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $627 $425 $627
15,533
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $34 - $34
1,172
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $40 - $40
1,465
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $8,540 $695 - $8,540
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $16 $5 - $16
-
MMBtu
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $228 $30 - $228
-
MMBtu
08 2.4133: Use most efficient type of electric motors $490 $5,100 $490
16,413
kWh
-
TOTAL RECOMMENDED $10,385 $6,305 $1,601
41,324
kWh
$8,784
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs