ITAC Assessment: LE0383
ITAC logo
ITAC Assessment: LE0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Converted Paper
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 165,000
ft2
Annual Production 90
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,858 3,042,200
kWh
Electricity Demand $123,187 9,759
kW-mo/yr
Electricity Fees $2,097 -
Natural Gas $390,544 65,292
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,489 $40 $1,224
11,130
kWh
$265
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,539 $300 $3,719
33,807
kWh
$820
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $817 $220 $676
6,142
kWh
$141
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,956 $15,120 $37,667
342,426
kWh
$17,289
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,869 $5,500 $3,380
30,729
kWh
$1,489
-
kW-mo/yr
-
06 2.1221: Replace obsolete burners with more efficient ones $18,711 $69,360 - - $18,711
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,230 $63,360 $8,649
78,624
kWh
$4,581
-
kW-mo/yr
-
TOTAL RECOMMENDED $98,611 $153,900 $55,315
502,858
kWh
$24,585
-
kW-mo/yr
$18,711
-
MMBtu
TOTAL IMPLEMENTED $6,028 $340 $4,943
44,937
kWh
$1,085
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs