Assessment Year | 2014 |
---|---|
Principal Product | Converted Paper |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
165,000
ft2
|
Annual Production | 90
thousand feet
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,858 | 3,042,200 |
kWh
|
$0.11 |
Electricity Demand | $123,187 | 9,759 |
kW-mo/yr
|
$12.62 |
Electricity Fees | $2,097 | - |
|
- |
Natural Gas | $390,544 | 65,292 |
MMBtu
|
$5.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $98,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,028 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,489 | $40 |
$1,224
11,130
kWh
|
$265
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,539 | $300 |
$3,719
33,807
kWh
|
$820
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $817 | $220 |
$676
6,142
kWh
|
$141
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $54,956 | $15,120 |
$37,667
342,426
kWh
|
$17,289
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,869 | $5,500 |
$3,380
30,729
kWh
|
$1,489
-
kW-mo/yr
|
- | |
06 | 2.1221: Replace obsolete burners with more efficient ones | $18,711 | $69,360 | - | - |
$18,711
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,230 | $63,360 |
$8,649
78,624
kWh
|
$4,581
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $98,611 | $153,900 |
$55,315
502,858
kWh
|
$24,585
-
kW-mo/yr
|
$18,711
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,028 | $340 |
$4,943
44,937
kWh
|
$1,085
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs