| Assessment Year | 1983 |
|---|---|
| Principal Product | HEAT TRANSFER EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $35,819 | 701,055 |
kWh
|
$0.051 |
| Natural Gas | $44,816 | 13,413 |
MMBtu
|
$3.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,133 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $118 | $120 |
$118
3,810
kWh
|
|
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $42 | - |
$42
1,465
kWh
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,133 | $250 |
$5,133
160,317
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,062 | $3,740 |
$1,062
21,395
kWh
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $942 | $4,420 |
$942
22,567
kWh
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $769 | $757 |
$769
15,240
kWh
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $210 | $13 |
$210
4,103
kWh
|
|
| 08 | 2.7261: Install timers and/or thermostats | $114 | $326 |
$114
3,810
kWh
|
|
| TOTAL RECOMMENDED | $8,390 | $9,626 |
$8,390
232,707
kWh
|
||
| TOTAL IMPLEMENTED | $5,133 | $250 |
$5,133
160,317
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs