ITAC Assessment: OK0082
ITAC logo
ITAC Assessment: OK0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PRINTED MATERIAL
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,767 502,931
kWh
Natural Gas $3,192 875
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $250 - $250
4,982
kWh
-
02 2.7261: Install timers and/or thermostats $317 $351 $159
5,275
kWh
$158
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $449 $94 $449
10,551
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $31 $33 $31
586
kWh
-
05 2.3191: Use demand controller or load shedder $475 - $475
-
kWh
-
TOTAL RECOMMENDED $1,522 $478 $1,364
21,394
kWh
$158
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs