Assessment Year | 1983 |
---|---|
Principal Product | REINFORCED PLASTIC PIPE |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,340 | 5,521,102 |
kWh
|
$0.037 |
Natural Gas | $229,760 | 74,970 |
MMBtu
|
$3.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,572 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,584 | $836 |
$1,584
35,756
kWh
|
- | |
02 | 2.7261: Install timers and/or thermostats | $1,209 | $2,125 | - |
$1,209
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,825 | $280 |
$4,825
175,264
kWh
|
- | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $11,300 | $28,000 | - |
$11,300
-
MMBtu
|
|
05 | 2.2122: Install / repair insulation on condensate lines | $649 | $388 | - |
$649
-
MMBtu
|
|
06 | 2.2136: Install / repair insulation on steam lines | $144 | $160 | - |
$144
-
MMBtu
|
|
07 | 2.2122: Install / repair insulation on condensate lines | $281 | $158 | - |
$281
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $535 | $315 | - |
$535
-
MMBtu
|
|
09 | 2.2135: Repair and eliminate steam leaks | $13,080 | $500 | - |
$13,080
-
MMBtu
|
|
10 | 2.6218: Turn off equipment when not in use | $45,615 | - | - |
$45,615
-
MMBtu
|
|
11 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,350 | - | - |
$2,350
-
MMBtu
|
|
TOTAL RECOMMENDED | $81,572 | $32,762 |
$6,409
211,020
kWh
|
$75,163
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs