ITAC Assessment: AS0435
ITAC logo
ITAC Assessment: AS0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Printing services
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 25,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 3,302
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,902 1,212,320
kWh
Electricity Demand $79,486 5,012
kW-mo/yr
Electricity Fees $8,788 -
Waste Disposal Costs
Water Usage $5,727 503,404
Tgal
TOTAL YEARLY COSTS $193,903
RECOMMENDED SAVINGS* $39,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,295 $200 $15,472
187,770
kWh
$10,823
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,087 $5,774 $4,169
50,600
kWh
$2,918
-
kW-mo/yr
- - -
03 3.5316: Contract a wood pallet recycling company $3,510 $60 - - - $3,510 -
04 3.4151: Minimize water usage $912 $2,243 - - $912
-
Tgal
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $787 $60 $422
5,118
kWh
$365
-
kW-mo/yr
- - -
06 4.652: Replace existing equipment with more suitable substitutes $780 $325 $113
1,369
kWh
$73
-
kW-mo/yr
- - $594
TOTAL RECOMMENDED $39,371 $8,662 $20,176
244,857
kWh
$14,179
-
kW-mo/yr
$912
-
Tgal
$3,510 $594
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs