ITAC Assessment: OK0072
ITAC logo
ITAC Assessment: OK0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PIPE HANDLING EQUIPMENT
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,375
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,445 2,630,129
kWh
Natural Gas $30,688 10,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $1,147 $3,280 $1,147
-
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,406 $180 $3,406
118,406
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $470 - $470
16,413
kWh
-
04 2.7261: Install timers and/or thermostats $18,782 $1,129 - $18,782
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,033 $824 $1,033
20,223
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $970 $351 $970
18,757
kWh
-
TOTAL RECOMMENDED $25,808 $5,764 $7,026
173,799
kWh
$18,782
-
MMBtu
TOTAL IMPLEMENTED $21,932 $5,584 $3,150
38,980
kWh
$18,782
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs