ITAC Assessment: NC0592
ITAC logo
ITAC Assessment: NC0592
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Coxial cable
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 100,000
ft2
Annual Production 10,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,864 807,600
kWh
Electricity Demand $13,636 3,520
kW-mo/yr
Electricity Fees $383 -
Natural Gas $298 32
MMBtu
Waste Disposal Costs
Water Usage $1,361 47
Tgal
TOTAL YEARLY COSTS $90,542
RECOMMENDED SAVINGS* $36,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $17,321 $14,000 $15,463
166,806
kWh
$1,858
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,653 $100 $2,368
25,542
kWh
$285
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,020 $200 $1,134
12,230
kWh
$136
-
kW-mo/yr
$(-100.0) $(-150.0)
04 2.4239: Eliminate or reduce compressed air usage $2,944 $5,070 $2,629
28,355
kWh
$315
-
kW-mo/yr
- -
05 2.2625: Chill water to the highest temperature possible $467 $25 $417
4,493
kWh
$50
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,190 $23,263 $10,487
113,127
kWh
$1,276
-
kW-mo/yr
- $427
TOTAL RECOMMENDED $36,595 $42,658 $32,498
350,553
kWh
$3,920
-
kW-mo/yr
$(-100.0) $277
TOTAL IMPLEMENTED $36,595 $42,658 $32,498
350,553
kWh
$3,920
-
kW-mo/yr
$(-100.0) $277
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs