| Assessment Year | 1983 |
|---|---|
| Principal Product | FINNED BOILER TUBES |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $1 M to 5M |
| # of Employees | 42 |
| Plant Area |
n/a
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $72,620 | 1,605,510 |
kWh
|
$0.045 |
| Natural Gas | $11,354 | 3,809 |
MMBtu
|
$2.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $800 | $2,460 |
$800
-
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,371 | $160 |
$3,371
163,247
kWh
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $194 | $400 | - |
$194
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,595 | $16,800 |
$5,595
150,059
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156 | $95 |
$156
3,224
kWh
|
- | |
| TOTAL RECOMMENDED | $10,116 | $19,915 |
$9,922
316,530
kWh
|
$194
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs