Assessment Year | 1983 |
---|---|
Principal Product | FINNED BOILER TUBES |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $1 M to 5M |
# of Employees | 42 |
Plant Area |
n/a
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,620 | 1,605,510 |
kWh
|
$0.045 |
Natural Gas | $11,354 | 3,809 |
MMBtu
|
$2.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $800 | $2,460 |
$800
-
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,371 | $160 |
$3,371
163,247
kWh
|
- | |
03 | 2.7261: Install timers and/or thermostats | $194 | $400 | - |
$194
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,595 | $16,800 |
$5,595
150,059
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156 | $95 |
$156
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $10,116 | $19,915 |
$9,922
316,530
kWh
|
$194
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs