ITAC Assessment: LS0223
ITAC logo
ITAC Assessment: LS0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Amusement and Recreation
NAICS 711219: Other Spectator Sports
SIC 7999: Amusement and Recreation Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 29
Plant Area 17,360
ft2
Annual Production 1
units
Production Hrs. Annual 4,732
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,642 478,520
kWh
Electricity Demand $5,344 1,297
kW-mo/yr
Natural Gas $3,157 387
MMBtu
TOTAL YEARLY COSTS $43,143
RECOMMENDED SAVINGS* $12,956 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,392

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 4.661: Level zero – install control systems for existing equipment $11,364 $1,800 $11,364
157,824
kWh
-
02 2.7261: Install timers and/or thermostats $160 $50 $160
2,229
kWh
-
03 2.7135: Install occupancy sensors $39 $50 $39
539
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,193 $2,990 $1,041
14,462
kWh
$152
-
kW-mo/yr
05 2.7243: Improve air circulation with destratification fans / other methods $200 $630 $200
2,771
kWh
-
TOTAL RECOMMENDED $12,956 $5,520 $12,804
177,825
kWh
$152
-
kW-mo/yr
TOTAL IMPLEMENTED $1,392 $3,090 $1,240
17,230
kWh
$152
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs