Assessment Year | 2014 |
---|---|
Principal Product | Hydraulic lift tables for material handling |
NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
114,750
ft2
|
Annual Production | 20,000
pieces
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,955 | 1,626,720 |
kWh
|
$0.046 |
Electricity Demand | $43,998 | 5,378 |
kW-mo/yr
|
$8.18 |
Natural Gas | $39,370 | 5,124 |
MMBtu
|
$7.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,877 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,877 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $5,056 | - | - | - | $5,056 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,440 | $1,188 |
$2,440
52,944
kWh
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $2,796 | $2,066 | - |
$2,796
-
MMBtu
|
- | |
04 | 2.6242: Minimize operation of equipment maintained in standby condition | $248 | - |
$248
5,375
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,000 | $10,067 |
$3,000
65,075
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,792 | $1,656 |
$2,792
60,570
kWh
|
- | - | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $13,545 | $3,641 | - |
$13,545
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $29,877 | $18,618 |
$8,480
183,964
kWh
|
$16,341
-
MMBtu
|
$5,056 | ||
TOTAL IMPLEMENTED | $29,877 | $18,618 |
$8,480
183,964
kWh
|
$16,341
-
MMBtu
|
$5,056 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs