ITAC Assessment: OK0064
ITAC logo
ITAC Assessment: OK0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BUTTERFLY VALVES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 70,000
pieces
Production Hrs. Annual 3,400
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,700 1,465,123
kWh
Natural Gas $45,000 15,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,687

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $707 $56 $707
21,102
kWh
-
02 2.7261: Install timers and/or thermostats $1,830 $400 $1,830
54,807
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,330 $1,405 $1,330
24,033
kWh
-
04 2.7261: Install timers and/or thermostats $1,749 $560 - $1,749
-
MMBtu
05 2.7261: Install timers and/or thermostats $485 - - $485
-
MMBtu
06 2.3512: De-energize excess transformer capacity $586 - $586
17,585
kWh
-
TOTAL RECOMMENDED $6,687 $2,421 $4,453
117,527
kWh
$2,234
-
MMBtu
TOTAL IMPLEMENTED $6,687 $2,421 $4,453
117,527
kWh
$2,234
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs