ITAC Assessment: OK0063
ITAC logo
ITAC Assessment: OK0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product FURNITURE WOOD
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 4,500
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,100 311,841
kWh
Natural Gas $9,200 2,630
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,442 $400 $1,442
22,860
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $345 $156 $345
5,569
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $106 $205 $106
1,758
kWh
-
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $972 - $880
14,068
kWh
$92
-
MMBtu
05 2.7111: Reduce illumination to minimum necessary levels $2,330 - $2,330
28,136
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $140 - $140
2,345
kWh
-
TOTAL RECOMMENDED $5,335 $761 $5,243
74,736
kWh
$92
-
MMBtu
TOTAL IMPLEMENTED $106 $205 $106
1,758
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs