ITAC Assessment: OK0062
ITAC logo
ITAC Assessment: OK0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SUN CONTROL LOUVERS ETC.
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area
n/a
Annual Production 1,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,892 155,334
kWh
Natural Gas $16,227 5,733
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $82 $450 - $82
-
MMBtu
02 2.2212: Use minimum safe oven ventilation $1,749 - - $1,749
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $337 $285 $337
7,620
kWh
-
04 2.7261: Install timers and/or thermostats $909 $599 - $909
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $130 $690 - $130
-
MMBtu
TOTAL RECOMMENDED $3,207 $2,024 $337
7,620
kWh
$2,870
-
MMBtu
TOTAL IMPLEMENTED $3,207 $2,024 $337
7,620
kWh
$2,870
-
MMBtu