ITAC Assessment: MI0352
ITAC logo
ITAC Assessment: MI0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Ophthalmic Lenses
NAICS 339115: Ophthalmic Goods Manufacturing
SIC 3851: Ophthalmic Goods
Sales Range $5
M
to 10
M
# of Employees 64
Plant Area 15,000
ft2
Annual Production 158,000
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,173 691,020
kWh
Electricity Demand $20,720 2,073
kW-mo/yr
Electricity Fees $(-5,560.0) -
LPG $7,116 260
MMBtu
TOTAL YEARLY COSTS $158,449
RECOMMENDED SAVINGS* $52,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,319

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $15,430 $10,964 $13,391
67,975
kWh
$2,039
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $11,207 $3,600 $11,207
56,888
kWh
- - -
03 2.9112: Use solar heat to heat water $7,116 $10,125 - - - $7,116
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $6,201 $7,920 $5,301
26,908
kWh
$900
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,725 $2,284 $3,205
16,271
kWh
$520
-
kW-mo/yr
- -
06 2.8114: Change rate schedules or other changes in utility service $3,012 $100 - - $3,012 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,851 $1,846 $1,591
8,076
kWh
$260
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,571 $1,995 $1,351
6,859
kWh
$220
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $656 $319 $566
2,872
kWh
$90
-
kW-mo/yr
- -
10 2.7492: Use proper thickness of insulation on building envelope $603 $2,315 $403
2,044
kWh
$200
-
kW-mo/yr
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $525 $160 $455
2,309
kWh
$70
-
kW-mo/yr
- -
12 2.4323: Use optimum size and capacity equipment $518 $2,294 $448
2,275
kWh
$70
-
kW-mo/yr
- -
TOTAL RECOMMENDED $52,415 $43,922 $37,918
192,477
kWh
$4,369
-
kW-mo/yr
$3,012 $7,116
-
MMBtu
TOTAL IMPLEMENTED $50,319 $41,767 $36,112
183,309
kWh
$4,079
-
kW-mo/yr
$3,012 $7,116
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs