Assessment Year | 1982 |
---|---|
Principal Product | FABRICATED STEEL |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 1,680
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,231 | 735,639 |
kWh
|
$0.11 |
Fuel Oil #2 | $3,168 | 592 |
MMBtu
|
$5.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,367 | $200 |
$2,367
83,236
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $3,675 | $3,000 |
$3,675
70,340
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,620 | $8,300 |
$17,295
269,637
kWh
|
$(-3,675.0)
-
MMBtu
|
|
04 | 2.3212: Optimize plant power factor | $5,976 | $3,900 |
$5,976
-
kWh
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $130 | - |
$130
2,345
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29 | $13 |
$29
586
kWh
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,612 | $12,150 |
$1,612
-
kWh
|
- | |
TOTAL RECOMMENDED | $27,409 | $27,563 |
$31,084
426,144
kWh
|
$(-3,675.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,813 | $15,363 |
$7,813
156,507
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs