ITAC Assessment: OK0051
ITAC logo
ITAC Assessment: OK0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product FABRICATED STEEL
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 1,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,231 735,639
kWh
Fuel Oil #2 $3,168 592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,367 $200 $2,367
83,236
kWh
-
02 2.2437: Recover waste heat from equipment $3,675 $3,000 $3,675
70,340
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,620 $8,300 $17,295
269,637
kWh
$(-3,675.0)
-
MMBtu
04 2.3212: Optimize plant power factor $5,976 $3,900 $5,976
-
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $130 - $130
2,345
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $29 $13 $29
586
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,612 $12,150 $1,612
-
kWh
-
TOTAL RECOMMENDED $27,409 $27,563 $31,084
426,144
kWh
$(-3,675.0)
-
MMBtu
TOTAL IMPLEMENTED $7,813 $15,363 $7,813
156,507
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs