Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BLANK CHECKS
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 148
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,374 1,390,094
kWh
Natural Gas $14,253 4,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $259 $450 - $259
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $443 $234 $443
12,309
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $400 $3,576 $400
14,068
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $7 $60 $7
293
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $39 $75 $39
1,465
kWh
-
TOTAL RECOMMENDED $1,148 $4,395 $889
28,135
kWh
$259
-
MMBtu
TOTAL IMPLEMENTED $443 $234 $443
12,309
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs