| Assessment Year | 1982 |
|---|---|
| Principal Product | FAUCETS(RESIDENTIAL & COMMERCIAL) |
| NAICS |
n/a
|
| SIC | 3432: Plumbing Fixture Fittings and Trim |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $194,362 | 5,473,623 |
kWh
|
$0.036 |
| Natural Gas | $74,582 | 24,136 |
MMBtu
|
$3.09 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,548 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $6,489 | - | - |
$6,489
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,887 | $18,833 |
$3,887
107,855
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,789 | $510 |
$3,789
102,579
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,390 | $1,124 |
$1,390
38,687
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $993 | $630 | - |
$993
-
MMBtu
|
|
| TOTAL RECOMMENDED | $16,548 | $21,097 |
$9,066
249,121
kWh
|
$7,482
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs