| Assessment Year | 1999 |
|---|---|
| Principal Product | Gourmet Cakes and Jams |
| NAICS |
n/a
|
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $1 M to 5M |
| # of Employees | 80 |
| Plant Area |
10,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,110
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $8,395 | 126,319 |
kWh
|
$0.066 |
| Electricity Fees | $1,190 | - |
|
- |
| Natural Gas | $4,863 | 558 |
MMBtu
|
$8.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,203 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $913 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $279 | $1,390 |
$279
4,103
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $185 | $90 |
$185
2,931
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $85 | $20 |
$85
1,172
kWh
|
- | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $299 | $100 |
$98
1,172
kWh
|
$201
-
MMBtu
|
- | |
| 05 | 2.7444: Close holes and openings in building such as broken windows | $1,270 | $60 | - |
$1,270
-
MMBtu
|
- | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $643 | - |
$643
9,672
kWh
|
- | - | |
| 07 | 4.423: Move product using mechanical means | $4,442 | - | - | - | $4,442 | |
| TOTAL RECOMMENDED | $7,203 | $1,660 |
$1,290
19,050
kWh
|
$1,471
-
MMBtu
|
$4,442 | ||
| TOTAL IMPLEMENTED | $913 | $110 |
$913
13,775
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs