Assessment Year | 1999 |
---|---|
Principal Product | Metal Fasteners |
NAICS |
n/a
|
SIC | 3428: |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
55,000
ft2
|
Annual Production | 200,000,000
pieces
|
Production Hrs. Annual | 5,330
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,798 | 2,660,317 |
kWh
|
$0.043 |
Electricity Demand | $37,954 | 7,205 |
kW-mo/yr
|
$5.27 |
Electricity Fees | $25,762 | - |
|
- |
Natural Gas | $3,574 | 502 |
MMBtu
|
$7.12 |
LPG | $479 | 19 |
MMBtu
|
$25.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,029 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,762 | $39,160 |
$11,558
270,223
kWh
|
$3,204
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,069 | $900 |
$1,069
24,912
kWh
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $420 | $490 |
$420
9,672
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,332 | $20 |
$1,332
31,067
kWh
|
- | |
05 | 2.4224: Upgrade controls on compressors | $4,446 | $140 |
$4,446
104,045
kWh
|
- | |
TOTAL RECOMMENDED | $22,029 | $40,710 |
$18,825
439,919
kWh
|
$3,204
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs