ITAC Assessment: OD0144
ITAC logo
ITAC Assessment: OD0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Fasteners
NAICS
n/a
SIC 3428:
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 55,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 5,330
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,798 2,660,317
kWh
Electricity Demand $37,954 7,205
kW-mo/yr
Electricity Fees $25,762 -
Natural Gas $3,574 502
MMBtu
LPG $479 19
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,762 $39,160 $11,558
270,223
kWh
$3,204
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,069 $900 $1,069
24,912
kWh
-
03 2.6231: Utilize controls to operate equipment only when needed $420 $490 $420
9,672
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,332 $20 $1,332
31,067
kWh
-
05 2.4224: Upgrade controls on compressors $4,446 $140 $4,446
104,045
kWh
-
TOTAL RECOMMENDED $22,029 $40,710 $18,825
439,919
kWh
$3,204
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs