ITAC Assessment: OD0140
ITAC logo
ITAC Assessment: OD0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Folding Cartons
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 37
Plant Area 26,300
ft2
Annual Production 2,000
ton
Production Hrs. Annual 4,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,789 488,863
kWh
Electricity Demand $11,741 2,229
kW-mo/yr
Electricity Fees $3,516 -
LPG $13,996 1,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,213

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,272 $14,704 $2,531
46,307
kWh
$741
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $1,213 $100 $1,213
22,274
kWh
- -
03 2.7314: Reduce ventilation air $3,529 $140 $3,529
63,892
kWh
- -
04 2.7314: Reduce ventilation air $2,602 - $4,042
73,857
kWh
$1,060
-
kW-mo/yr
$(-2,500.0)
05 2.4113: Install motor voltage controller on lightly loaded motors $510 $1,870 $404
7,327
kWh
$106
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,126 $16,814 $11,719
213,657
kWh
$1,907
-
kW-mo/yr
$(-2,500.0)
TOTAL IMPLEMENTED $1,213 $100 $1,213
22,274
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs