ITAC Assessment: MO0292
ITAC logo
ITAC Assessment: MO0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Automative Magnesium Die Casting
NAICS
n/a
SIC 3361:
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,146 7,694,314
kWh
Electricity Demand $92,702 1,776
kW-mo/yr
Electricity Fees $31,369 -
Natural Gas $71,283 10,861
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,424,295 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,121 $2,933 $912
31,360
kWh
$209
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $6,365 $11,960 $5,112
175,850
kWh
$1,253
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $3,842 $339 $3,059
105,217
kWh
$783
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,013 $80 $4,021
138,335
kWh
$992
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $350 - $298
10,258
kWh
$52
-
kW-mo/yr
- - -
06 3.5316: Contract a wood pallet recycling company $800 - - - $800
-
lb
- -
07 4.452: Eliminate shift $1,400,000 $2,000,000 - - - - $1,400,000
08 4.515: Install shelves / racks to utilize unused space $6,804 $500 - - - $6,804 -
TOTAL RECOMMENDED $1,424,295 $2,015,812 $13,402
461,020
kWh
$3,289
-
kW-mo/yr
$800
-
lb
$6,804 $1,400,000
TOTAL IMPLEMENTED $17,491 $15,312 $13,402
461,020
kWh
$3,289
-
kW-mo/yr
$800
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs