ITAC Assessment: OD0125
ITAC logo
ITAC Assessment: OD0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Foam Medical Products
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 76,800
ft2
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,979 651,817
kWh
Electricity Demand $14,020 2,745
kW-mo/yr
Electricity Fees $997 -
Natural Gas $19,474 3,138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,283 $67,670 $6,319
117,819
kWh
$2,964
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $704 $840 $704
22,274
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $6,650 $630 - - $6,650
-
MMBtu
04 2.3191: Use demand controller or load shedder $5,182 $8,000 - $5,182
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $4,293 $1,295 $4,293
38,101
kWh
- -
06 2.6121: Reduce hot water temperature to the minimum required $619 - - - $619
-
MMBtu
TOTAL RECOMMENDED $26,731 $78,435 $11,316
178,194
kWh
$8,146
-
kW-mo/yr
$7,269
-
MMBtu
TOTAL IMPLEMENTED $17,256 $69,140 $7,023
140,093
kWh
$2,964
-
kW-mo/yr
$7,269
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings