| Assessment Year | 1998 |
|---|---|
| Principal Product | Foam Medical Products |
| NAICS |
n/a
|
| SIC | 3086: Plastics Foam Products |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
76,800
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $34,979 | 651,817 |
kWh
|
$0.054 |
| Electricity Demand | $14,020 | 2,745 |
kW-mo/yr
|
$5.11 |
| Electricity Fees | $997 | - |
|
- |
| Natural Gas | $19,474 | 3,138 |
MMBtu
|
$6.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,731 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,256 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,283 | $67,670 |
$6,319
117,819
kWh
|
$2,964
-
kW-mo/yr
|
- | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $704 | $840 |
$704
22,274
kWh
|
- | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $6,650 | $630 | - | - |
$6,650
-
MMBtu
|
|
| 04 | 2.3191: Use demand controller or load shedder | $5,182 | $8,000 | - |
$5,182
-
kW-mo/yr
|
- | |
| 05 | 2.4226: Use / purchase optimum sized compressor | $4,293 | $1,295 |
$4,293
38,101
kWh
|
- | - | |
| 06 | 2.6121: Reduce hot water temperature to the minimum required | $619 | - | - | - |
$619
-
MMBtu
|
|
| TOTAL RECOMMENDED | $26,731 | $78,435 |
$11,316
178,194
kWh
|
$8,146
-
kW-mo/yr
|
$7,269
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,256 | $69,140 |
$7,023
140,093
kWh
|
$2,964
-
kW-mo/yr
|
$7,269
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs