ITAC Assessment: OD0111
ITAC logo
ITAC Assessment: OD0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Concrete panels and structural members
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 150,000
ft2
Annual Production 88,400
units
Production Hrs. Annual 5,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,697 2,435,229
kWh
Electricity Demand $135,916 9,598
kW-mo/yr
Electricity Fees $3,977 -
Natural Gas $30,272 4,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,322

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,907 $496 $547
31,360
kWh
$1,360
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $7,382 $18,789 $3,163
181,125
kWh
$4,219
-
kW-mo/yr
- - -
03 2.7261: Install timers and/or thermostats $2,962 $200 - - $2,962
-
MMBtu
- -
04 3.8211: Convert to aqueous cleaning system $1,029 $1,300 - - - $1,029
-
gal
-
05 3.6192: Use a less expensive method of waste removal $3,042 - - - - - $3,042
-
lb
TOTAL RECOMMENDED $16,322 $20,785 $3,710
212,485
kWh
$5,579
-
kW-mo/yr
$2,962
-
MMBtu
$1,029
-
gal
$3,042
-
lb
TOTAL IMPLEMENTED $16,322 $20,785 $3,710
212,485
kWh
$5,579
-
kW-mo/yr
$2,962
-
MMBtu
$1,029
-
gal
$3,042
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs