ITAC Assessment: OD0100
ITAC logo
ITAC Assessment: OD0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Uninterruptible Power Supplies
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 37,900
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,167
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,762 347,890
kWh
Electricity Demand $23,809 19,681
kW-mo/yr
Electricity Fees $8,944 -
Natural Gas $2,481 433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $824 $3,754 $682
21,981
kWh
$142
-
kW-mo/yr
- - - -
02 2.7261: Install timers and/or thermostats $503 - - - $503
-
MMBtu
- - -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $289 - - - - - $289
-
lb
-
04 3.4151: Minimize water usage $213 $90 - - - $213
-
Tgal
- -
05 4.441: Install automatic packing equipment $2,016 $1,160 - - - - - $2,016
TOTAL RECOMMENDED $3,845 $5,004 $682
21,981
kWh
$142
-
kW-mo/yr
$503
-
MMBtu
$213
-
Tgal
$289
-
lb
$2,016
TOTAL IMPLEMENTED $503 - - - $503
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs