Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fabrics
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 110,000
ft2
Annual Production 18,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,998 2,691,383
kWh
Electricity Demand $84,488 12,120
kW-mo/yr
Electricity Fees $13,628 -
LPG $107,231 16,837
MMBtu
Fuel Oil #6 $262,990 76,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $740 $1,659 $398
24,326
kWh
$342
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,489 $2,400 $2,489
152,696
kWh
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,515 $1,500 - - $7,515
-
MMBtu
-
04 3.5313: Increase amount of waste recovered for resale $900 - - - - $900
-
lb
05 3.5313: Increase amount of waste recovered for resale $594 - - - - $594
-
lb
TOTAL RECOMMENDED $12,238 $5,559 $2,887
177,022
kWh
$342
-
kW-mo/yr
$7,515
-
MMBtu
$1,494
-
lb
TOTAL IMPLEMENTED $10,004 $3,900 $2,489
152,696
kWh
- $7,515
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs