Assessment Year | 1997 |
---|---|
Principal Product | Reinforcing steel bars |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $5 M to 10M |
# of Employees | 76 |
Plant Area |
64,500
ft2
|
Annual Production | 15,076
ton
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $21,024 | 401,524 |
kWh
|
$0.052 |
Electricity Demand | $8,696 | 1,581 |
kW-mo/yr
|
$5.50 |
Electricity Fees | $4,294 | - |
|
- |
Natural Gas | $2,368 | 295 |
MMBtu
|
$8.03 |
Fuel Oil #2 | $1,878 | 320 |
MMBtu
|
$5.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,476 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $85 | $247 |
$54
1,172
kWh
|
$31
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,090 | $150 |
$2,605
49,824
kWh
|
$1,485
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $758 | $320 |
$758
14,361
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $65 | - |
$65
1,172
kWh
|
- | - | |
05 | 2.7261: Install timers and/or thermostats | $563 | $210 |
$563
10,551
kWh
|
- | - | |
06 | 3.6192: Use a less expensive method of waste removal | $2,392 | - | - | - |
$2,392
-
lb
|
|
TOTAL RECOMMENDED | $7,953 | $927 |
$4,045
77,080
kWh
|
$1,516
-
kW-mo/yr
|
$2,392
-
lb
|
||
TOTAL IMPLEMENTED | $5,476 | $680 |
$3,991
75,908
kWh
|
$1,485
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs