ITAC Assessment: OD0080
ITAC logo
ITAC Assessment: OD0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Reinforcing steel bars
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $5
M
to 10
M
# of Employees 76
Plant Area 64,500
ft2
Annual Production 15,076
ton
Production Hrs. Annual 2,210
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,024 401,524
kWh
Electricity Demand $8,696 1,581
kW-mo/yr
Electricity Fees $4,294 -
Natural Gas $2,368 295
MMBtu
Fuel Oil #2 $1,878 320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $85 $247 $54
1,172
kWh
$31
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,090 $150 $2,605
49,824
kWh
$1,485
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $758 $320 $758
14,361
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $65 - $65
1,172
kWh
- -
05 2.7261: Install timers and/or thermostats $563 $210 $563
10,551
kWh
- -
06 3.6192: Use a less expensive method of waste removal $2,392 - - - $2,392
-
lb
TOTAL RECOMMENDED $7,953 $927 $4,045
77,080
kWh
$1,516
-
kW-mo/yr
$2,392
-
lb
TOTAL IMPLEMENTED $5,476 $680 $3,991
75,908
kWh
$1,485
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs