ITAC Assessment: GT0919
ITAC logo
ITAC Assessment: GT0919
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Reclaimed water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 59
Plant Area 83,000
ft2
Annual Production 2,555
units
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $818,645 13,940,194
kWh
TOTAL YEARLY COSTS $818,645
RECOMMENDED SAVINGS* $241,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $166,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $21,617 $400 - $21,617
02 2.4239: Eliminate or reduce compressed air usage $67,773 $8,000 $67,773
1,148,706
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,045 $18,576 $8,045
136,358
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,910 $55,885 $11,910
201,873
kWh
-
05 2.9113: Use solar heat for heat $41,493 $850,000 $41,493
705,498
kWh
-
06 2.4322: Use or replace with energy efficient substitutes $90,950 $1,944,000 $90,950
1,541,524
kWh
-
TOTAL RECOMMENDED $241,788 $2,876,861 $220,171
3,733,960
kWh
$21,617
TOTAL IMPLEMENTED $166,768 $1,970,576 $166,768
2,826,589
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs