Assessment Year | 1997 |
---|---|
Principal Product | Electroplated and Annealed Parts |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 108 |
Plant Area |
90,000
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,969 | 3,335,287 |
kWh
|
$0.016 |
Electricity Demand | $110,361 | 15,609 |
kW-mo/yr
|
$7.07 |
Electricity Fees | $19,364 | - |
|
- |
Natural Gas | $91,121 | 19,969 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,372 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,171 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,337 | $1,495 | - | - |
$4,337
-
MMBtu
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,063 | $2,738 |
$667
40,445
kWh
|
$396
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $723 | $882 |
$448
27,257
kWh
|
$275
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $385 | $210 |
$385
23,447
kWh
|
- | - | - | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $996 | $1,452 | - | - | - | - |
$996
-
lb
|
- | |
06 | 3.3131: Use evaporation to concentrate material | $2,088 | $625 | - | - | - |
$2,088
-
gal
|
- | - | |
07 | 4.123: Reduce defects by reducing product tipping | $6,780 | $1,911 | - | - | - | - | - | $6,780 | |
TOTAL RECOMMENDED | $16,372 | $9,313 |
$1,500
91,149
kWh
|
$671
-
kW-mo/yr
|
$4,337
-
MMBtu
|
$2,088
-
gal
|
$996
-
lb
|
$6,780 | ||
TOTAL IMPLEMENTED | $2,171 | $3,830 |
$1,500
91,149
kWh
|
$671
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs