Assessment Year | 1996 |
---|---|
Principal Product | Industrial Fluid Pumps |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
100,000
ft2
|
Annual Production | 27,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,715 | 5,448,711 |
kWh
|
$0.016 |
Electricity Demand | $183,388 | 24,735 |
kW-mo/yr
|
$7.41 |
Electricity Fees | $61,639 | - |
|
- |
Natural Gas | $7,209 | 974 |
MMBtu
|
$7.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,028 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,723 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $7,046 | $60 |
$4,136
20,223
kWh
|
- |
$2,910
-
MMBtu
|
- | - | - | |
02 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,217 | $1,860 |
$1,217
69,754
kWh
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,956 | $6,885 |
$2,898
179,367
kWh
|
$4,058
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,834 | $400 |
$1,834
114,009
kWh
|
- | - | - | - | - | |
05 | 3.6192: Use a less expensive method of waste removal | $5,723 | $20,400 | - | - | - | - | - |
$5,723
-
lb
|
|
06 | 3.6124: Burn waste oil for heat | $2,167 | $2,920 |
$174
10,844
kWh
|
$491
-
kW-mo/yr
|
- | - |
$1,502
-
gal
|
- | |
07 | 3.3125: Use distillation, evaporation to remove contaminants | $12,085 | $15,400 | - | - | - |
$12,085
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $37,028 | $47,925 |
$10,259
394,197
kWh
|
$4,549
-
kW-mo/yr
|
$2,910
-
MMBtu
|
$12,085
-
Tgal
|
$1,502
-
gal
|
$5,723
-
lb
|
||
TOTAL IMPLEMENTED | $5,723 | $20,400 | - | - | - | - | - |
$5,723
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs