ITAC Assessment: OD0067
ITAC logo
ITAC Assessment: OD0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Synthetic Novelty Yarns
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $5
M
to 10
M
# of Employees 91
Plant Area 56,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,229 3,261,723
kWh
Electricity Demand $96,919 14,269
kW-mo/yr
Electricity Fees $18,010 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $789 $887 $468
24,033
kWh
$321
-
kW-mo/yr
-
02 2.4226: Use / purchase optimum sized compressor $34,085 $5,100 $20,227
940,797
kWh
$13,858
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,526 $7,365 $2,092
52,755
kWh
$1,434
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,202 $400 $2,202
113,423
kWh
- -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $2,106 - - - $2,106
-
lb
TOTAL RECOMMENDED $42,708 $13,752 $24,989
1,131,008
kWh
$15,613
-
kW-mo/yr
$2,106
-
lb
TOTAL IMPLEMENTED $2,202 $400 $2,202
113,423
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs