ITAC Assessment: OD0066
ITAC logo
ITAC Assessment: OD0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Novelty Yarns
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 112,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,951 13,403,576
kWh
Electricity Demand $338,072 28,058
kW-mo/yr
Electricity Fees $48,353 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,666 $17,234 $4,924
246,190
kWh
$10,742
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $11,780 $2,040 $11,780
589,097
kWh
- - -
03 2.3132: Recharge batteries on during off-peak demand periods $1,938 $2,000 - $1,938
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,114 $400 $1,114
55,686
kWh
- - -
05 2.4133: Use most efficient type of electric motors $2,427 $1,616 $1,114
55,686
kWh
$1,313
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $214 $290 $98
4,982
kWh
$116
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $3,621 $360 $3,621
181,125
kWh
- - -
08 3.6124: Burn waste oil for heat $477 $3,520 - $277
-
kW-mo/yr
$200
-
gal
-
09 3.4113: Treat and reuse rinse waters $3,600 $3,800 - - - $3,600
-
Tgal
TOTAL RECOMMENDED $40,837 $31,260 $22,651
1,132,766
kWh
$14,386
-
kW-mo/yr
$200
-
gal
$3,600
-
Tgal
TOTAL IMPLEMENTED $1,114 $400 $1,114
55,686
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs