ITAC Assessment: LS0013
ITAC logo
ITAC Assessment: LS0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Paper Cups
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2656: Sanitary Food Containers, Except Folding
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 23,000
ft2
Annual Production 110,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,013 2,807,040
kWh
Electricity Demand $81,417 10,856
kW-mo/yr
Other Gas $4,630 135
MMBtu
TOTAL YEARLY COSTS $273,060
RECOMMENDED SAVINGS* $18,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,009 $200 $7,009
105,210
kWh
-
02 2.7134: Use photocell controls $8,468 $4,570 $7,042
105,706
kWh
$1,426
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,305 $2,200 $2,305
34,594
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $135 $290 $135
2,024
kWh
-
05 2.7425: Clean or color roof to reduce solar load $313 $1,105 $313
4,698
kWh
-
TOTAL RECOMMENDED $18,230 $8,365 $16,804
252,232
kWh
$1,426
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs