Assessment Year | 1996 |
---|---|
Principal Product | Commercial printing; magazines, catalogs, inserts |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 82 |
Plant Area |
51,670
ft2
|
Annual Production | 75,000,000
pieces
|
Production Hrs. Annual | 5,550
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,963 | 2,626,612 |
kWh
|
$0.018 |
Electricity Demand | $94,587 | 13,792 |
kW-mo/yr
|
$6.86 |
Electricity Fees | $15,969 | - |
|
- |
Natural Gas | $20,461 | 4,318 |
MMBtu
|
$4.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,354 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $189 | $160 |
$189
10,551
kWh
|
- | - | - | - | |
02 | 2.7261: Install timers and/or thermostats | $337 | $270 |
$337
18,757
kWh
|
- | - | - | - | |
03 | 2.2442: Preheat combustion air with waste heat | $11,625 | $5,634 | - | - |
$11,625
-
MMBtu
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $161 | $485 |
$88
4,982
kWh
|
$73
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,584 | $6,110 |
$818
45,721
kWh
|
$766
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $408 | $689 |
$408
22,860
kWh
|
- | - | - | - | |
07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $46 | - | - | - | - | - |
$46
-
lb
|
|
08 | 3.8211: Convert to aqueous cleaning system | $3,004 | $5,050 | - | - | - |
$3,004
-
gal
|
- | |
TOTAL RECOMMENDED | $17,354 | $18,398 |
$1,840
102,871
kWh
|
$839
-
kW-mo/yr
|
$11,625
-
MMBtu
|
$3,004
-
gal
|
$46
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs