ITAC Assessment: OD0040
ITAC logo
ITAC Assessment: OD0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bacon
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 38,000
ft2
Annual Production 23,695,000
ton
Production Hrs. Annual 4,300
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,809 6,586,460
kWh
Fuel Oil #6 $52,949 19,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,658

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,870 $10,484 $7,870
156,213
kWh
-
02 2.4133: Use most efficient type of electric motors $3,135 $8,610 $3,135
62,134
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,814 $3,630 $2,814
55,979
kWh
-
04 2.2437: Recover waste heat from equipment $13,414 $54,257 - $13,414
-
MMBtu
05 2.7261: Install timers and/or thermostats $882 $780 $882
17,585
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $709 $800 $709
14,068
kWh
-
TOTAL RECOMMENDED $28,824 $78,561 $15,410
305,979
kWh
$13,414
-
MMBtu
TOTAL IMPLEMENTED $6,658 $13,040 $6,658
132,181
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs