Assessment Year | 1995 |
---|---|
Principal Product | Bacon |
NAICS |
n/a
|
SIC | 2011: Meat Packing Plants |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
38,000
ft2
|
Annual Production | 23,695,000
ton
|
Production Hrs. Annual | 4,300
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $331,809 | 6,586,460 |
kWh
|
$0.050 |
Fuel Oil #6 | $52,949 | 19,413 |
MMBtu
|
$2.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,824 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,658 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,870 | $10,484 |
$7,870
156,213
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $3,135 | $8,610 |
$3,135
62,134
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,814 | $3,630 |
$2,814
55,979
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $13,414 | $54,257 | - |
$13,414
-
MMBtu
|
|
05 | 2.7261: Install timers and/or thermostats | $882 | $780 |
$882
17,585
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $709 | $800 |
$709
14,068
kWh
|
- | |
TOTAL RECOMMENDED | $28,824 | $78,561 |
$15,410
305,979
kWh
|
$13,414
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,658 | $13,040 |
$6,658
132,181
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs