ITAC Assessment: OD0033
ITAC logo
ITAC Assessment: OD0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product peanuts
NAICS
n/a
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 2,040
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,809 3,049,238
kWh
Natural Gas $4,677 753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4323: Use optimum size and capacity equipment $12,595 $4,616 $12,595
203,107
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $752 $800 $752
12,016
kWh
03 2.4133: Use most efficient type of electric motors $823 $2,967 $823
13,482
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $261 $747 $261
4,103
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,994 $6,431 $2,994
48,066
kWh
TOTAL RECOMMENDED $17,425 $15,561 $17,425
280,774
kWh
TOTAL IMPLEMENTED $1,575 $3,767 $1,575
25,498
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs