ITAC Assessment: OD0027
ITAC logo
ITAC Assessment: OD0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Gaskets, Packing and Sealing Devices
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 37,500
ft2
Annual Production 11,651,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $309,331 6,211,606
kWh
Natural Gas $6,863 1,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,893

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2612: Use cooling tower water instead of refrigeration $41,731 $48,000 $41,731
890,387
kWh
02 2.4133: Use most efficient type of electric motors $15,270 $11,420 $15,270
306,565
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $403 $118 $403
8,206
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,019 $6,600 $18,019
361,958
kWh
05 2.4221: Install compressor air intakes in coolest locations $890 $500 $890
17,878
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,253 $14,228 $8,253
165,885
kWh
07 2.7135: Install occupancy sensors $2,164 $2,084 $2,164
43,376
kWh
TOTAL RECOMMENDED $86,730 $82,950 $86,730
1,794,255
kWh
TOTAL IMPLEMENTED $68,893 $69,328 $68,893
1,436,108
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs